pm.

conject Logo
edge

Forgot your login data?

Support

Release Notes

  • language
    • Deutsch (Germany)
    • English (US/EU)
    • Polski (Polish)
    • Русский (Russian)
conject.com  /  Project Management  /  Case studies
 
  • Overview
  • Support
  • Release Notes
  • Prices

conjectPM in action
Customer Success Studies

  • ARCADIS Deutschland in Project General hospital "Schaumburger Land"
  • Banyan Estate, Thailand
  • Multi Development: Boulevard Berlin
  • Project Management: IKEA
  • Project Development: Sonae Sierra
  • Project Management: BMW
  • Project Management: Allianz Immobilien

ARCADIS Deutschland in Project General hospital "Schaumburger Land"

Visualisation: Schuster Pechtold Schmidt Architekten, Munich

"We performed a quantum leap, no one can hide anymore as the light has now been turned on!" "No more printing of e-mail attachments, manual filing or distribution. This way I save half an hour per project per day alone." 

(Jürgen Zimmermann, Project Manager, ARCADIS Deutschland GmbH)

The project in numbers:
Client: PRO DIAKO
Project Manager: ARCADIS Deutschland GmbH
49.000 m² gross floor space
24.000 m² usable floor space
date of design start: 2010
construction period: 2011 – 2013
total invest: 140 Million Euro approx.

PDF downloadDownload the case study (680KB)

Banyan Estate, Thailand

Banyan Estate, Thailand

Everything is at hand immediately. Everything is completely traceable. And the setup of the software by conject was unbelievably fast. The system was available after the first workshop day.

(Ton Beekman, Managing Director, Blue Lotus Hua Hin (Thailand) Co, Ltd)


The Project

The Banyan Estate Hua Hin is a prestigious housing development in the royal resort town of Hua Hin, 200 kilometres south of Bangkok. The Banyan Estate is developed on a total land area of approximately 432,000 sqm. The Banyan Estate comprises the development of 85 houses, 167 villas and more than 200 condominiums/apartments.

Lead Participants
Shareholder and Initiator/Developer: Blue Lotus Hua Hin (Thailand) Co, Ltd.
Various Sub Contractors
Software Provider and Consultant: conject AG

Project Duration
2007-2012

Investment Volume
Over US$ 100 million

PDF downloadDownload the case study (792KB)

to Top

Multi Development: Boulevard Berlin

Multi Development: Boulevard Berlin

Multi Development is working on several parallel projects together with an extremely diverse group of project partners. This is why it is imperative to always be able to maintain an overview. We can only achieve this through uniform working methods using standardized processes and predefined workflows. conject provides exactly that.

(Thilo Werner, Multi Development Germany GmbH)


Lead Participants
Owner: Multi Development Germany GmbH
Project developer: Multi Veste Berlin GmbH
Project manager: ARCADIS Immobilien Consulting
Architect: Ortner & Ortner Baukunst, T+T Design

Total Rental Space
Approx. 81,000 sqm, of which 70,000 sqm retail space

Project Duration
4 years (Spring 2007 to Fall 2011)

Investment Volume
Approx. €450 million

PDF downloadDownload the case study (954KB)

to Top

Project Management: IKEA

IKEA (Japan)

IKEA's plans are ambitious: In Kamen near Dortmund, construction on a store with 29,000m² floor space began on April 5th, 2004. The grand opening took place on November 24th, 2004. As a result, IKEA was able to complete construction in the shortest amount of time ever for a building of this size. The project team achieved such spectacular results to a large extent thanks to conjectPM

to Top

Project Development: Sonae Sierra

Source: Sonae Sierra

"Through the uniform project structure, we quickly get settled into projects and their requirements. Our partner companies are thrilled with the prompt availability of planning documentation."

 

Since 2002, the Portuguese company, Sonae Sierra, has been using conjectPM for project development to support its successful expansion in Europe and South America. From the start, all relevant documents have been filed in a structure which is uniform across projects, and roughly reflects the company structure. Departments can access the desired results without major introduction to either the project or the product, regardless of their location. Language differences thus have no influence from the start on the inner-European exchange of knowledge. The project structure exists in every case in English and is available in the language of the country where the project is located. Knowledge is exchanged transparently and all data is available centrally even after a halt and/or resumption in development.

 

"Optimal execution of projects is first possible through the use of conject's project development technology."

to Top

Project Management: BMW

BMW Factory Leipzig

"All data is instantly available to all project participants - each according to his respective rights - providing a level of transparency that allows consistent documentation of planning without media disruptions"

 

Production halls and offices for the BMW Works in Leipzig were completed as planned. That was at the end of 2003. Now it was time to step back and take stock. Those responsible for the project took a meticulous look: Was execution of the project efficient and what were its results? Where could time and money have been saved, what could be improved or changed in the future? Project directors and building owners wanted to know exactly and came to the conclusion: "An extremely cost-effective tool."

 

to Top

Project Management: Allianz Immobilien

Taunus Facility, Frankfurt

"This has never been carried out in Europe in this form until now."

 

It is obvious that thorough coordination of the project processes and workflows using conjectPM should include all project participants if possible. Within conjectPM "Taunusanlage" (Taunus facilities), there are over 170 participants with a data volume of approx. 34 gigabytes. As a result, all planning processes and documentation are documented comprehensively, efficiency increases many times over. Large amounts of data can be managed trouble-free and clearly displayed. With the support of fully developed and constantly optimized functions, all those involved can access the information intended for them at any time and from any place.

 

to Top

bookmark this page
  • bookmark in your browser
  • bookmark at mister wong
  • publish in twitter
  • bookmark at del.icio.us
  • bookmark at digg.com
  • bookmark at furl.net
  • bookmark at linksilo.de
  • bookmark at reddit.com
  • bookmark at spurl.net
  • bookmark at technorati.com
  • bookmark at google.com
  • bookmark at yahoo.com
  • bookmark at facebook.com
  • bookmark at stumbleupon.com
Join our mailing list
  • conjectPM Document Control
    • Prices
    • References
    • Release Notes
    • Support
  • conjectFM Facilities Management
    • Modules
    • References
    • Buy
    • Support
  • conjectCM Construction Cost
    • Online Data Room
    • Support
  • conject Company
    • Contact
    • conject locations
    • News & Media
    • Career
  • © 2000-2012 conject.com, All rights reserved.
  • Legal Notice
  • Terms & Conditions
  • Privacy Statement
  • Inside
  • Sitemap
  • Online Demo